Possible Smells:
- Today: Paint: 8 south final coats, primed walls on 7 south
- Welding in the new lobby on the ceiling of the 2nd floor during the day.
- Painting: 7th floor
- Friday:Welding in the lobby from 5:00 pm to 3:30 am
Tenant Relocation:
- 9th and 3rd Floor South: Wednesday May 23 at 9:30 am
Update of Construction From Last Night:
- worked on removal of barriers on the north east corner of the building.
- worked on 9th floor east tie back framing and door frame install, tape and finish on 8,7,6 east, framing of damper walls on 3rd floor restrooms, drywall 6 east tie backs, grid on 3 east, drywall on 6 east tie backs, grid on first floor.
- worked on heads on 7 south, first floor sprinkler lines, heads on 6 south
- worked on fire damper install on 3rd floor,
- 7thfloor west and south GRD’s,
- above ceiling punch on 7 west and south, low pressure duct on 1st floor, off set elbows on duct on the 9th floor
- worked on duct replacement on 8th floor at boxes 8-5,8-4,8-2, measure for duc ton 6 east
- worked on dust and clean throughout
- worked on secure room electrical above ceiling 8th floor north,
- worked on power for furniture move backs on 3 north,
- lighting rough in 3 east,
- HVAC power 8 north,
- 7th floor above ceiling punch list
- worked on fire alarm trim and devices on 7 east and elevator lobbies east all floors
- worked lobby stone demo on second floor
- worked on 8 south final coats, primed walls on 7 south
- worked on stool sill touch up on 3 south, 9 south